Chapel Properties were honoured to be awarded the contract to carry out structural repairs on the iconic Woodbridge Tide Mill—a remarkable landmark with over 800 years of history and one of the few remaining tide mills still in operation today.
Our work began with the installation of temporary structural supports, including steel plates, channels, acrow props, and scaffold tubes, to ensure the stability of the building throughout the repair process. We then carefully removed 300mm from the base of each timber post and dismantled the existing bearers.
To raise the pier by 300mm, four courses of engineering bricks were laid and new Ekki timber bearers were then installed to provide long-lasting support.
This project required meticulous planning and coordination, particularly in aligning work schedules with the changing tide times. Despite the logistical challenges, it was a privilege to contribute to the preservation of such a historically significant structure in the heart of Woodbridge.