Chapel Properties was approached by a local school with a request to renovate two outdated student bathrooms and convert them into a single, modern unisex facility.
The project began with a full strip out of the existing bathrooms, including the removal of all cubicles, toilets, sinks, radiators, and flooring. The adjoining wall between the two rooms was demolished and original doorways blocked up to open up the space, allowing for a more efficient layout.
Chapel Properties supplied and installed all new sanitaryware, including modern toilets, sinks, and fittings. A hygiene panel was fitted behind the sink area to provide a clean and durable splashback solution.
To complete the transformation, the entire bathroom was redecorated using high-quality, wipeable paint on the walls, ceiling, and woodwork—chosen specifically for its durability and ease of maintenance.
The result is a bright and hygienic bathroom that better serves the needs of the students.





