Chapel Properties were proudly awarded the restoration works at Framlingham Post Office following severe flooding caused by Storm Babet in October 2023. The building was inundated with approximately two feet of water, resulting in significant damage and the need for urgent and comprehensive repairs to restore this vital community facility.
The project began with the removal of the remaining concrete, followed by excavation and the installation of new foundations. New floor joists and moisture-resistant chipboard were fitted, and existing floorboards were resecured. To facilitate the drying process, low-level plaster and skirting boards were removed, later replaced with fresh plasterwork and new skirtings.
In the staff room, the original kitchen units and tiles were removed and replaced with a newly installed kitchen and worktop. Throughout the ground floor, walls, doors, and skirting boards were redecorated to a high standard, bringing the space back to life.
Chapel Properties were pleased to contribute to the recovery of such an important local service, helping to get the post office fully operational once again. This meaningful project was even featured on BBC News, highlighting its significance to the community.